08-19-2009, 09:01 AM
Design and Construction of Driven Pile Foundations
info:
Design and Construction of Driven Pile Foundations
The purpose of this report is to document the issues related to the design and construction of driven pile foundations at the Central Artery/Tunnel project. Construction issues that are presented include pile heave and the heave of an adjacent building during pile driving.n Mitigation measures, including the installation of wick drains and the use of preaugering, proved to be ineffective. The results of 15 dynamic and static load tests are also presented and suggest that the piles have more capacity than what they were designed for. The information presented in this report will be of interest to geotechnical engineers working with driven pile foundation systems.
PUBLICATION NO. FHWA-HRT-05-159, JUNE 2006
Research, Development, and Technology
Turner-Fairbank Highway Research Center
6300 Georgetown Pike
McLean, VA 22101-2296
Gary L. Henderson
Director, Office of Infrastructure
Research and Development
Number Of Pages: 59
Size: Less than 1MB
Download:
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************