Incheon Bridge (Korea)
Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge in Korea. Incheon Bridge is constituted of severol special featured bridges including a magnificent cable-stayed bridge which has a main span of BOO m to cross the main navigation channel of the Incheon Port. Incheon Bridge is the first trial to apply AASHTO LRFD (load & resistance factor deSign) to both the superstructures and the substructures in Korea. Various experiences of advanced design and construction method from the Inch eon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in bridge engineering through this project will contribute to the national development ofthe long-span bridge technologies remarkably
---------------------------------------------------
I will upload part by part as soon as possible
Part 1: INCHEON BRIDGE: FACTS AND THE STATE OF THE ART
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Video Introduction about Incheon Bridge
81MB video, 12.28 minutes.
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
2.Project Financing for BTO section of Incheon Bridge Project
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
[/quote]
Link in post #1 should be taken as
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
3.Design and construction of Incheon bridge CSB pylon
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Final: Full set of Incheon Bridge
1169 pages in PDF format
Including all above post, except video file
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:
http://forum.civilea.com/thread-27464.html
***************************************
Please reposting for the " Final: Full set of Incheon Bridge "