Civil Engineering Association

Full Version: Full Depth Precast Concrete Highway Bridge Decks
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Full Depth Precast Concrete Highway Bridge Decks

Author: M. G. Oliva, L.C. Bank, J.S. Russell | Size: 7.45 MB | Format: PDF | Publisher: WisDOT | Year: 2007 | pages: 138

[Image: 47761151281133495084.jpg]


[Image: info.png]

IBRC 3 was a multi-stage project completed over a four year span. The three phases of the
process are outlined below.
can be found here:
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************