Civil Engineering Association

Full Version: MnDOT: National Bridge Inspection StandardsCompliance Review Report
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
NBIS Bridge Inspection Compliance Review

[Image: info.png]
The independent review of the Mn/DOT bridge inspection policies and procedures began with the consultant team’s first bridge inspection assignment of the Blatnik Bridge on August 6th, 2007 where the teams used the previous Mn/DOT bridge inspection report for reference and comparison. The consultant teams continued to utilize the previous Mn/DOT reports for reference throughout the entire project while performing over 300 fracture critical and routine bridge inspections. These inspections included a diverse statewide group of structures on the trunk highway system that was selected as a peer sample for the compliance review. The intent of the peer sample was to compare the consultant’s inspection findings with Mn/DOT’s previous findings.

[Image: screen.png]
[Image: 06905448242710489149.jpg]

[Image: Download.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

[Image: password.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************