Composite girder bridge
Current time: 08-17-2018, 05:09 AM
Users browsing this thread: 1 Guest(s)
Author: chykoxp
Last Post: chykoxp
Replies 0
Views 1036

Composite girder bridge
#1
Hi every one, i´m doing a work for my marter course of civil engeneering, and the work is to avariate a railway composite girder bridge with 2 steel box girders and a concrete slab with 2 lanes. At the moment i got all the structure in SAP2000 14.2.2 using bridge model and is everything ok, but now i want so simulate the construction process(incremental launching), and for that have created groups (piles, deck1, deck3,....), created a Contruction Scheduler. When ir run de model it doesn´t do the schedule, only the first step(piles).

I would thanks for any help
link with files:

***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************


[-] The following 1 user says Thank You to chykoxp for this post:
  • malc
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
Composite steel-concrete girder (EC4) - help request Grunf 9 4,368 09-17-2010, 12:36 PM
Last Post: Grunf



Users browsing this thread: 1 Guest(s)