Sources of geotechnical risk, F.J. Baynes ,Quarterly Journal of Engineering Geology
Current time: 10-19-2018, 01:58 AM
Users browsing this thread: 2 Guest(s)
Author: storm
Last Post: lisine
Replies 3
Views 2450

Sources of geotechnical risk, F.J. Baynes ,Quarterly Journal of Engineering Geology
#1
Sources of geotechnical risk



F.J. Baynes

Quarterly Journal of Engineering Geology & Hydrogeology; August 2010; v. 43; no. 3; p. 321-331; DOI: 10.1144/1470-9236/08-003

[Image: Download.png]

***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



Moderator note:
Info added. Thread moved from Request Section to Magazine, Journals, Papers and Presentations.
(Grunf)





[-] The following 2 users say Thank You to storm for this post:
  • nhim4mat2006, farahshaheen47
Reply
#2
here
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

[-] The following 11 users say Thank You to hich for this post:
  • toa011, sia1, ynopum, hrezaei, shanta, kowheng, cigutierrezg, isurya, zrilek, farahshaheen47, nhim4mat2006
Reply
#3
File Expired
Please upload it again
.
[-] The following 1 user says Thank You to daywalker for this post:
  • farahshaheen47
Reply
#4
Sources of geotechnical risk

Author: F.J. Baynes | Size: 0.45 MB | Format: PDF | Quality: Original preprint |
Publisher/Journal: Quarterly Journal of Engineering Geology and Hydrogeology | Year: August 2010 | pages: 11(p. 321-331)

[Image: info.png]
Abstract: The geotechnical risks that can affect projects result from a range of hazards associated with geological conditions and geological processes, but also from hazards associated with the geo-engineering process. For example, active faults identified during pre-feasibility studies will pose one type of hazard, whereas a management decision to limit the extent of a site investigation to save money will pose another type of hazard. A systematic assessment of the nature and the source of the various hazards may be used to differentiate the types of geotechnical risk. Examples from projects are provided and some statistics are presented, to indicate the rates of occurrence of the various types of geotechnical risks in projects. Some established approaches to managing geotechnical risks in projects are noted.

[Image: download.png]
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



[-] The following 9 users say Thank You to lisine for this post:
  • kowheng, farahshaheen47, zrilek, daywalker, Dell_Brett, DamaD, nhim4mat2006, shadabg, uetian19
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
RISK ASSESSMENT USING SEISMIC RISK MANAGEMENT AND RESPONSE ANALYSIS OF BASE ISOLATION TAFATNEB 0 1,157 12-20-2013, 10:05 AM
Last Post: TAFATNEB
Canadian Geotechnical Journal - Papers lisine 3 2,473 02-11-2013, 10:20 AM
Last Post: lisine
Journal of Geotechnical Engineering - Requested Paper melkat 0 1,289 07-17-2012, 08:05 AM
Last Post: melkat
ASCE: Journal of Geotechnical and Geoenvironmental Engineering 1998 sodapas 2 2,768 10-23-2011, 11:07 AM
Last Post: joker™
ASCE: Journal of Geotechnical and Geoenvironmental Engineering 1997 sodapas 1 2,473 09-04-2011, 05:30 PM
Last Post: sodapas



Users browsing this thread: 2 Guest(s)