Pile Driving Record Calculation (SPP Foundation)
Current time: 06-22-2018, 08:15 AM
Users browsing this thread: 1 Guest(s)
Author: lednar_ved
Last Post: Nilupa
Replies 1
Views 3191

Pile Driving Record Calculation (SPP Foundation)
#1
Pile Driving Record (SPP Foundation)

[Image: info.png]
A sample pile driving record using the MODIFIED HILEY's FORMULA for the Steel Pipe Pile Foundation of Bridge Abutment.
Name of Bridge: Ihawan Bridge
Location: Philippines
Superstructure: AASHTO PC Girder
Substructure: SPP Foundation
Length of Bridge: 114.9m
No. of Span: 3



[Image: Download.png]

***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************

“If I have seen a little farther from others, It is because I stood in the shoulders of giants”
[-] The following 16 users say Thank You to lednar_ved for this post:
  • daywalker, Mohoh77, isurya, civilteam, madkestas, kam009, sasan7351, killerbee, gelbert, ramla2002, kami, gibran, telengkude, anezregar, tremonti, Nilupa
Reply
#2
Dead Link. Pls. reupload if possible.
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
SPP Pile Driving Record Using JRA Specs lednar_ved 2 2,917 07-15-2011, 02:02 PM
Last Post: jpver



Users browsing this thread: 1 Guest(s)