Civil Engineering Association
[CivilEA SHOP] SUMMARY OF R.C BEAM AND COLUMN REINFORCEING REQUIREMENTS FOR SPECIAL MOMENT RESISTING - Printable Version

+- Civil Engineering Association (https://forum.civilea.com)
+-- Forum: CivilEA Shop (https://forum.civilea.com/forum-168.html)
+--- Forum: Own-Copyrighted Material (https://forum.civilea.com/forum-170.html)
+--- Thread: [CivilEA SHOP] SUMMARY OF R.C BEAM AND COLUMN REINFORCEING REQUIREMENTS FOR SPECIAL MOMENT RESISTING (/thread-56379.html)



SUMMARY OF R.C BEAM AND COLUMN REINFORCEING REQUIREMENTS FOR SPECIAL MOMENT RESISTING - Administrator - 08-01-2021

SUMMARY OF R.C BEAM AND COLUMN REINFORCEING REQUIREMENTS FOR SPECIAL MOMENT RESISTING FRAMES - ACI318

Size: 175 KB | Format: DWG | Quality: Original preprint | Publisher: CivilEA.com


[Image: 98828373141842013099.png]


[Image: info.png]


Very useful drawings that help you whatever you need to consider in column, beam, joint shear control,
  • SUMMARY OF R.C. COLUMNS REINFORCING REQUIREMENTS FOR SPECIAL MOMENT RESISTING FRAMES
  • BAR BENDING DETAILS SCHEDULE (DEVELOPMENT LENGTH, OVERLAP LENGTH, HOOK DEVELOPMENT LENGTH, STANDARD HOOK DIMENSIONS, BAR BENDING DIAMETER)
  • SUMMARY OF R.C. BEAMS REINFORCING REQUIREMENTS FOR SPECIAL MOMENT RESISTING FRAMES

THIS IS FESTIVAL PRICE (ORIGINAL PRICE IS 30 USD):

[Image: download.png]
Pricing has been


This post has been made by CivilEA Post-Generator V2.3.1