Full Depth Precast Concrete Highway Bridge Decks - Printable Version +- Civil Engineering Association (https://forum.civilea.com) +-- Forum: eBooks (https://forum.civilea.com/forum-63.html) +--- Forum: Journals, Papers and Presentations (https://forum.civilea.com/forum-74.html) +--- Thread: Full Depth Precast Concrete Highway Bridge Decks (/thread-26003.html) |
Full Depth Precast Concrete Highway Bridge Decks - ir_71 - 05-26-2011 Full Depth Precast Concrete Highway Bridge Decks Author: M. G. Oliva, L.C. Bank, J.S. Russell | Size: 7.45 MB | Format: PDF | Publisher: WisDOT | Year: 2007 | pages: 138
IBRC 3 was a multi-stage project completed over a four year span. The three phases of the process are outlined below.
Phase 1: Complete background research and preliminary engineering required to develop a proposed precast deck system and design procedure for the full depth, precast, prestressed concrete deck panels. Develop laboratory tests based on the proposed system and carry out all testing. Phase 2: Implement the full depth precast, prestressed concrete deck panel system on the Door Creek Bridge. Perform a constructability study and compare the construction of the innovative and conventional bridge deck systems. Evaluate structural performance. Determine minimum needed prestress levels across joints for future projects. Phase 3: Monitor both conventional and innovative bridge decks. Use non-destructive load tests and inspect for cracking to determine feasibility of using prefabricated, prestressed concrete deck panels in the future. Run analytical studies of loaded bridge. Code: *************************************** RE: Full Depth Precast Concrete Highway Bridge Decks - kowheng - 09-25-2012 Mirror Links: PDF 7.81 MB | RAR 7.55 MB Code: *************************************** |