Composite girder bridge - Printable Version +- Civil Engineering Association (https://forum.civilea.com) +-- Forum: Various (https://forum.civilea.com/forum-6.html) +--- Forum: Free Discussion (https://forum.civilea.com/forum-46.html) +--- Thread: Composite girder bridge (/thread-22826.html) |
Composite girder bridge - chykoxp - 03-04-2011 Hi every one, i´m doing a work for my marter course of civil engeneering, and the work is to avariate a railway composite girder bridge with 2 steel box girders and a concrete slab with 2 lanes. At the moment i got all the structure in SAP2000 14.2.2 using bridge model and is everything ok, but now i want so simulate the construction process(incremental launching), and for that have created groups (piles, deck1, deck3,....), created a Contruction Scheduler. When ir run de model it doesn´t do the schedule, only the first step(piles). I would thanks for any help link with files: Code: *************************************** |