Methods of resisting hydrostatic uplift in substructures by I. H. Wong - Printable Version +- Civil Engineering Association (https://forum.civilea.com) +-- Forum: eBooks (https://forum.civilea.com/forum-63.html) +--- Forum: Journals, Papers and Presentations (https://forum.civilea.com/forum-74.html) +--- Thread: Methods of resisting hydrostatic uplift in substructures by I. H. Wong (/thread-19347.html) |
Methods of resisting hydrostatic uplift in substructures by I. H. Wong - aslam - 11-30-2010 Methods of resisting hydrostatic uplift in substructures by I. H. Wong Mitic Associates, 95 Cashew Road #03-03, Singapore 679666, Singapore Received 5 March 2001; revised 8 May 2001; accepted 10 May 2001. Available online 13 August 2001. Abstract: Many underground structures are constructed for use as car parks and shops in basements of buildings and as mass rapid transit stations, depressed roadways and civil defense shelters in cities located in coastal areas where the ground is level and the elevations are low, with an attendant high groundwater table. This paper discusses the various methods of resisting hydrostatic uplift. These include the use of tension piles and the installation of a water pressure relief system under the base slab of the basement. A case history in Singapore employing a pressure relief system below a three-level basement is presented. Author Keywords: Deep excavation; Groundwater pressure; Uplift; Stiff; Soft soils Article Outline 1. Introduction 2. Mechanism of flotation caused by hydraulic uplift 3. Conventional methods to resist uplift 3.1. Toeing in of base slab into surrounding ground 3.2. Increasing dead weight of structure 3.3. Ground anchors 3.4. Tension piles 4. Design of tension piles 5. Methods to reduce or eliminate uplift 6. Design of under-drain system 6.1. Operating costs 7. Effects of dewatering on adjacent ground and structures 8. Case history Raffles City 8.1. Site conditions 8.2. Performance of under-drain system 9. Beneficial effects of pressure relief system for waterproofing of basement 10. Conclusions References Updated link: Code: *************************************** RE: Methods of resisting hydrostatic uplift in substructures by I. H. Wong - kuyasipil - 06-07-2011 Code: *************************************** RE: Methods of resisting hydrostatic uplift in substructures by I. H. Wong - Grunf - 06-07-2011 Code: *************************************** Uploaded: Jun/07/2011 File Size: 701.13 KB Paginated, Searchable text If you like this publication, CivilEA's team strongly suggest you to buy it! Support the authors! RE: Methods of resisting hydrostatic uplift in substructures by I. H. Wong - lisine - 11-12-2015 Code: *************************************** |