Civil Engineering Association
Pile Driving Record Calculation (SPP Foundation) - Printable Version

+- Civil Engineering Association (https://forum.civilea.com)
+-- Forum: Civil Engineering Resource (https://forum.civilea.com/forum-1.html)
+--- Forum: Civil Engineering Documents (https://forum.civilea.com/forum-89.html)
+---- Forum: Calculation Notes & Analysis Files (https://forum.civilea.com/forum-80.html)
+---- Thread: Pile Driving Record Calculation (SPP Foundation) (/thread-14707.html)



Pile Driving Record Calculation (SPP Foundation) - lednar_ved - 07-29-2010

Pile Driving Record (SPP Foundation)

[Image: info.png]
A sample pile driving record using the MODIFIED HILEY's FORMULA for the Steel Pipe Pile Foundation of Bridge Abutment.
Name of Bridge: Ihawan Bridge
Location: Philippines
Superstructure: AASHTO PC Girder
Substructure: SPP Foundation
Length of Bridge: 114.9m
No. of Span: 3



[Image: Download.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************



RE: Pile Driving Record Calculation (SPP Foundation) - Nilupa - 04-11-2011

Dead Link. Pls. reupload if possible.