Civil Engineering Association

Full Version: Nonlinear TH Analysis with the aid of SAP2000 V14.1 (Trial)
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Nonlinear TH Analysis with the aid of SAP2000 V14.1 (Trial)

[Image: 38419031485529822739.jpg]

[Image: info.png]
probably it\'s very strong frame,

i can\'t push it, please let me know that how can i push it?

please inform me , if anything wrong,

best regards

[Image: Download.png]

Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************
Mirror Link:
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************
hey Audi,

did u solve it? i dont get what any problem there. are u going to pushover that frame or what?
this frame has a really huge capacity,(because need a define mass every story)

if you define masses every story, you can see real capacity for this frame,

you can use my excel sheet for seeing capacity, (pushover perforrmnace point v.1.0)

you can see above figure that this frame behavior= linear behavior

you can define mass 150 , 200, 200 .. for each story

kindly regards for your interest
Code:
***************************************
Content of this section is hidden, You must be registered and activate your account to see this content. See this link to read how you can remove this limitation:

http://forum.civilea.com/thread-27464.html
***************************************